TP-LINK WBS510-WBS210-1.1 安裝、保養、維修

WBS510-WBS210-1.1

裝CAM | 裝CCTV | 裝監控 — 硬件連工程一站式

產品簡介

tp-link WBS510-WBS210-1.1 為Outdoor Wireless Base Station,HKEZIT 提供原廠行貨連保養、上門安裝、調試及使用教學一站式服務。詳細規格以下方原廠 Datasheet 欄位為準,歡迎聯絡我們查詢 WBS510-WBS210-1.1 香港價格連安裝報價。

  • Base Station:Base Station
  • 處理器:Qualcomm Atheros enterprise AR9350B 560MHz CPU, MIPS 74Kc
  • Memory:64MB DDR2 RAM, 8MB Flash 1 10/100Mbps Shielded Ethernet Port
  • Interfaces:2 RP-SMA 1 Grounding Terminal
  • Hardware:1 Reset Button
HKEZIT 提供原廠行貨保養。硬件連專業安裝、設定及使用教學一站式報價,無需自行研究安裝與設定。我們同時承接裝CAM、裝CCTV、裝監控工程,硬件與工程同一團隊負責。
查詢價格連安裝 →
WBS510-WBS210-1.1 tp-link Outdoor Wireless Base Station 產品圖片

詳細規格

Base StationBase Station
處理器Qualcomm Atheros enterprise AR9350B 560MHz CPU, MIPS 74Kc
Memory64MB DDR2 RAM, 8MB Flash 1 10/100Mbps Shielded Ethernet Port (LAN0/POE) 1 10/100Mbps Shielded Ethernet Port (LAN1)
Interfaces2 RP-SMA 1 Grounding Terminal
Hardware1 Reset Button
FeaturesPassive Power over Ethernet via LAN0 (+4,5pins; -7,8pins) Power Supply Voltage range: 16-27VDC
Dimensions(L x W x H)189*75*32 mm 15KV ESD Protection Protection 6KV Lightning Protection Material: Outdoor ASA stabilized plastic Enclosure Weatherproof: IP65 water and dust proof design
Wireless StandardsIEEE 802.11b/g/n IEEE 802.11a/n
Proprietary ProtocolTDMA Mode (with Pharos MAXtream enabled)
Frequency2.4~2.483GHz 5.15~5.85GHz Up to 300Mbps (40MHz,Dynamic) Wireless Up to 144.4Mbps (20MHz,Dynamic)
Operation ModesAP / Client / Bridge / Repeater / AP Router / AP Client Router (WISP Client) WAN: Static/Dynamic/PPPoE/L2TP/PPTP LAN: Static/Dynamic/DHCP Forwarding: DMZ/ALG/UPnP/Virtual Server/Port Trigger Security: SPI Firewall/ Ping Forbidden/VPN/DoS Protection Network Configurations Access Control Static Routing Bandwidth Control Software IP & MAC Binding Features Pharos MAXtream TDMA Technology WBS210: 802.1
ManagementSNMP Agent (v2c) Ping Watch Dog Dynamic DDNS SSH Server Indicators: Signal Strength/Noise/Transmit CCQ/CPU/Memory Monitors: Throughput/Stations/Interfaces/ARP/Routes/WAN/DHCP System Tools Spectrum Analysis Speed Test Ping Traceroute WBS210: 802.11b/g/n Tx beamforming technology
System-levelWBS510: 802.11a/n Tx beamforming technology
OptimizationsIGMP Snooping/Proxy for multicast applications Hardware watch dog
CertificationCE, FCC, RoHS,IP65 Outdoor Wireless Base Station 24V 1A Passive PoE Adapter
Package ContentsPole Mounting Kit AC Power Cord Quick Installation Guide Microsoft Windows 98SE, NT, 2000, XP, VistaTM or Windows 8, Windows 7,
OthersMAC OS, NetWare, UNIX or Linux.
System RequirementsNote: We recommend you to use one of following Web browsers for better experience: Google Chrome, Safari, Firefox. IE browsers are not recommended. Operating Temperature: -30°C~70°C (-22°F~158°F) Storage Temperature: -40°C~70°C (-40°F~158°F) Operating Humidity: 10%~90% non-condensing Storage Humidity: 5%~95% non-condensing
Dimensions(WxDxH)110*57*33.5mm
Input Voltage100VAC-240VAC@50Hz-60Hz
Input Current0.8A Max @ 100VAC
Output Voltage24VDC (+4,5pins; -7,8pins)
POEOutput Current 1.0A Max (Support up to 60m Power over Ethernet)
AdapterEfficiency >80%
CertificationsCE/FCC/UL/IC/GS/PSB/C-tick/SAA/S-Mar 24 / 7 Global technical support

* 規格以原廠最新 Datasheet 為準。

下載完整PDF規格書 →

外形尺寸

WBS510-WBS210-1.1 外形尺寸圖 詳見圖示|Unit: mm

詳見圖示|Unit: mm

CCTV 監控安裝工程服務

HKEZIT 專營裝CAM、裝CCTV、裝監控工程,WBS510-WBS210-1.1 由我們供貨、安裝、調試到使用教學一站式完成。無論裝CAM、裝CCTV或裝監控,均由自家工程團隊上門施工,品質有保證。

裝CAM裝CCTV裝監控

CCTV 監控適合邊類專業客戶

WBS510-WBS210-1.1 tp-link Outdoor Wireless Base Station亦適合以下專業服務機構使用,保安同合規要求同一般商鋪唔一樣,歡迎查詢度身方案。

保險經紀行

客戶會面室簽單過程存證,減少銷售爭議,配合保監局合規要求。

WhatsApp 查詢 →

兒科診所

候診區同診症室監控兼顧家長安心同私隱,貴重醫療儀器防盜。

WhatsApp 查詢 →

測量師行/則師樓

現場勘察資料同客戶物業圖則屬機密,辦公室網絡同門禁保安係基本要求。

WhatsApp 查詢 →

婦產科診所

診症室及超聲波室私隱要求極高,出入口記錄配合門禁分級管理。

WhatsApp 查詢 →

建築工程顧問公司

圖則模型檔案室保密,配合工地現場監控延伸管理,項目資料防外洩。

WhatsApp 查詢 →

珠寶鑑定/拍賣行

高值品鑑定過程近攝存證,配合保險公司要求,防止調換或盜取。

WhatsApp 查詢 →

常見問題

WBS510-WBS210-1.1 香港哪裡有代理?

HKEZIT 提供原廠行貨連保養,WBS510-WBS210-1.1 原廠行貨連保養,提供上門評估、安裝、調試及使用教學一站式服務,全港 32 區均有服務。

此型號如何供電及駁線?

支援 PoE 供電時一條網線同時傳輸數據與電力,無需另行鋪設電源線;詳細供電規格請參閱上方規格表,安裝時我們會按現場環境設計走線。

錄影可以儲存多久、如何遠程監看?

儲存時間取決於解像度、碼率及硬碟容量,配合 H.265+ 壓縮可大幅延長;透過 官方 App 可隨時遠程實時監看及回放,無需固定 IP。

WBS510-WBS210-1.1 定 XC220-G3V 邊個好?

兩者屬同系列產品,實際應該邊個型號更適合,需視乎現場環境同需求而定。歡迎直接聯絡我們免費現場評估,由工程師建議最合適方案。

WBS510-WBS210-1.1 保養、維修邊度做?

HKEZIT 提供 WBS510-WBS210-1.1 原廠行貨連保養,安裝後如有故障可直接聯絡我們安排上門維修,毋須自行聯絡原廠。詳情請參閱CCTV 監控安裝工程頁面或聯絡我們查詢保養範圍。

香港安裝服務地區

HKEZIT 於全港各區提供 WBS510-WBS210-1.1 tp-link Outdoor Wireless Base Station供貨連專業安裝服務(裝CAM、裝CCTV、裝監控),熱門地區包括:土瓜灣CCTV 閉路電視安裝、大圍CCTV 閉路電視安裝、大埔CCTV 閉路電視安裝、大角咀CCTV 閉路電視安裝、將軍澳CCTV 閉路電視安裝、尖沙咀CCTV 閉路電視安裝、屯門CCTV 閉路電視安裝、旺角CCTV 閉路電視安裝。港島、九龍、新界全港 32 區均有上門安裝,歡迎聯絡我們查詢 WBS510-WBS210-1.1 香港價格連安裝報價。

CCTV 監控適用場景

WBS510-WBS210-1.1 tp-link Outdoor Wireless Base Station適合多種場景使用,以下為部分常見安裝場景,歡迎查詢是否適合您的現場環境。

查看更多CCTV 監控適用場景,請參閱 CCTV 監控安裝工程。

相關產品

如需整套CCTV 監控方案,請參閱 CCTV 監控安裝工程。

查詢 WBS510-WBS210-1.1 連安裝價格

免費上門評估,即日報價,原廠行貨保養

立即查詢 →